PHOTO GALLERY
- Propeller bluefitting
- Submerged arc welding
- Planetary Drive Bearing castings
- Stainless steel cladding of 14″ shaft
- Machining stainless steel cladding
- Repair of bearing fit on thruster housing
- Facing hub length of brass prop
- New rudder fabrication
- Rudder stock machining
- Machining 12″ stainless cladded propeller shaft
- Brass bushing
- New rudder fabrication
- Complete underwater gear supplied by E.J. Fields
- Blue fitting coupling
- 6 inch hole drilling
- Fiberglass wrap on 11″ shaft
- Rudder tube fabrication
- Blower shutoff valve
- Nickel chrome sleeve boring
- Propeller shaft division
- Cutting keyway in high speed shaft
- Propeller shaft division and training building
- Large Underwater gear Supplied by E.J. Fields
- Cleaning shaft
- 12″ shaft with prop and coupling
- Custom roller and housing assembly
- Becker Rudder stock machined and installed
- Complete rudder assemblies
- Plate boring and drilling
- Rudder assemblies
- Crane pedistal base
- 14 inch shaft ready to be repaired
- Drilling 6″ hole
- Machining 14″ shaft cladding