PHOTO GALLERY
- 14 inch shaft ready to be repaired
- Brass bushing
- Rudder stock machining
- Blue fitting coupling
- Propeller shaft division
- Crane pedistal base
- Custom roller and housing assembly
- Fiberglass wrap on 11″ shaft
- Rudder assemblies
- Complete underwater gear supplied by E.J. Fields
- 12″ shaft with prop and coupling
- Planetary Drive Bearing castings
- Rudder tube fabrication
- New rudder fabrication
- Complete rudder assemblies
- New rudder fabrication
- Submerged arc welding
- Stainless steel cladding of 14″ shaft
- 6 inch hole drilling
- Becker Rudder stock machined and installed
- Drilling 6″ hole
- Machining stainless steel cladding
- Cutting keyway in high speed shaft
- Large Underwater gear Supplied by E.J. Fields
- Machining 12″ stainless cladded propeller shaft
- Plate boring and drilling
- Machining 14″ shaft cladding
- Nickel chrome sleeve boring
- Cleaning shaft
- Propeller bluefitting
- Repair of bearing fit on thruster housing
- Facing hub length of brass prop
- Blower shutoff valve
- Propeller shaft division and training building