PHOTO GALLERY
- Brass bushing
- Propeller shaft division and training building
- New rudder fabrication
- Crane pedistal base
- Complete rudder assemblies
- 14 inch shaft ready to be repaired
- Fiberglass wrap on 11″ shaft
- Machining 12″ stainless cladded propeller shaft
- Planetary Drive Bearing castings
- Propeller bluefitting
- Rudder assemblies
- Complete underwater gear supplied by E.J. Fields
- New rudder fabrication
- 6 inch hole drilling
- 12″ shaft with prop and coupling
- Submerged arc welding
- Nickel chrome sleeve boring
- Cutting keyway in high speed shaft
- Rudder stock machining
- Machining stainless steel cladding
- Blower shutoff valve
- Facing hub length of brass prop
- Rudder tube fabrication
- Propeller shaft division
- Blue fitting coupling
- Plate boring and drilling
- Machining 14″ shaft cladding
- Becker Rudder stock machined and installed
- Cleaning shaft
- Custom roller and housing assembly
- Stainless steel cladding of 14″ shaft
- Large Underwater gear Supplied by E.J. Fields
- Drilling 6″ hole
- Repair of bearing fit on thruster housing